What would someone recommend if the FPSO cannot be disconnected from the Production Platform during emergency? No means of quick disconnect between the two facilities?


1 Answer

0
Normandy 5 years, 1 month ago
One should perform a study to assess the need for disconnecting FPSO in the event site conditions become hazardous (e.g. Production Platform instability, subsea blowout leading to extreme metocean conditions, fire and explosion risks form surface blowout).

Related Posts


Material Selection and Corrosion Control for Offshore Platform and FPSO
Material Selection and Corrosion Control for Offshore Platform and FPSO

Detailed corrosion prediction evaluations including consideration for CO2 should be performed to establish a materials selection and corrosion control report …

Next generation new built hulls for Floating Production Storage and Offloading (FPSO)
Next generation new built hulls for Floating Production Storage and Offloading (FPSO)

MODEC has announced that it has developed the “MODEC NOAH” and “M350”, next generation new built hulls for Floating Production …

FPSO Conversion Lessons Learned
FPSO Conversion Lessons Learned

FPSO conversions! Either VLCC to FPSO, FPSO redeployment, or similar engineering works for life extension of naval surface vessels, this …