What are the typical Gas Export Pipeline (GEP) procedures used for offshore installation?

Asked by judyp 5 years, 9 months ago | 1 Answers


1 Answer

0
Normandy 5 years, 9 months ago

The Gas Export Pipeline typically is devided into two categories:

  1. Pipeline Operation
    • Pipeline Operations Manual
    • Pipeline Pigging Procedures
  2. Pipeline Integrity
    • Pipeline Integrity Manual
    • Pipeline Inspection Plan/Procedures

Related Posts


Flowline - Pipeline Thermal Expansion Calculation
Flowline - Pipeline Thermal Expansion Calculation

SUMMARYFlowline/Pipeline Thermal/Pressure Expansion can be developed for submarine pipelines (both single pipe and Pipe-in-pipe) expansion assessments due to pressure and …

Piping and Vessels Preparation for Commissioning - Part 3

Part 2 - Leak Test 3. Dry-out3.1 GeneralAt the end of construction, and following commissioning tasks such as water flushing, …

Piping and Vessels Preparation for Commissioning - Part 5
Piping and Vessels Preparation for Commissioning - Part 5

Continue of Part 4 - Chemicals Loading of Vessels5. Inert gas purging 5.1 GeneralInert gas purging is most frequently required …

Pipeline Abandonment
Pipeline Abandonment

Requirements Pipelines should be decommissioned and abandoned (by removal or abandonment-in-place) in accordance with applicable national, regional and local regulations …

Oil production well simulation modeling problems and uncertainties
Oil production well simulation modeling problems and uncertainties

Oil and gas well modeling problems and uncertainties such as transient effects in the earth/formation for a single well, repeated …

Preventing scales in pipelines, wells, injection manifolds, etc.
Preventing scales in pipelines, wells, injection manifolds, etc.

Scale in pipelines, wells, injection manifolds greatly impacts the facility in a number of ways including deferred production, lost revenue …