How to differentiate between Dead Load and Fluid Load?
When performing load analysis for the jumper, how many type of analysis should be done to adequately satisfy the typical engineering analysis?
Are mooring line connections to FPSO, anchor piles or between chain-wire segments (including shackles or H-links) designed for chain minimum breaking load of 120%?
What is the typical requirement for spare capacity above the expected load on Electrical Equipment on an offshore facility?