In API 1111, the installation safety factor f1 is 3.33 for buckling check. When can a lower safety factor be used ?
Asked 3 years, 10 months ago by BrockDeider 2 Answers

In API 1111 to calculate the buckling check unity factor, an installation safety factor f1 of 3.33 is used. But since for the pipeline parameters under consideration the unity check is more than 1, we would like to take advantage of using a lower safety f...

Proper procedures to install instrument and air process piping/tubing
Asked 4 years, 5 months ago by taddpham 2 Answers

Sharing the installation procedures on instrument and air tubing/piping.

Availability and commitments of installation vessel for FPSO Topsides?
Asked 5 years, 9 months ago by Dan01 1 Answer

If I am currently in the FEED Stage of an FPSO, is it feasible to ask the FPSO Contractor reserve/guarantee an installation vessel for the FPSO topsides?)

Do operating company take over the equipment at the end of the FPSO installation?
Asked 5 years, 10 months ago by RichS29 1 Answer

Do operating company take over the equipment (i.e. empty reels) at the end of the FPSO installation?