Should bilge systems in the hull be kept separate from topsides drains?
Asked 5 years, 6 months ago by lampanda 1 Answer

Does bilge system in the hull is subjected to different discharge requirements? And therefore should it be kept separate from topsides drains?

Closed Drains Pressure Vessel be sized to accept drained fluids from the largest pressure vessel?
Asked 5 years, 7 months ago by antonjoh 1 Answer

Should the Closed Drains Pressure Vessel be sized to accept drained fluids from the largest pressure vessel on the facility, plus an allowance for any liquids continuously routed to the drains system?

Is it typical to require post-test inspection of compressor bearings, drains and nozzles is required?
Asked 5 years, 7 months ago by antonjoh 1 Answer

Is it typical to require post-test inspection of compressor bearings, drains and nozzles is required? In addition, at least one compressor of each train/configuration should be dismantled to allow full inspection of the rotating elements and shaft seal f...

Key factors in drain system design
Asked 6 years ago by odadmin 1 Answer

What are the key safety and environmental factors should i consider for drain system design