Subsea equipment insulation?

Asked by bxander 3 years, 11 months ago | 1 Answers

When required, as happened quite often in offshore drilling, external insulation be applied to the system to meet the required thermal insulating properties. Can someone share your experience on what should cover?


1 Answer

0
TiffiniMai 3 years, 11 months ago

The insulation system for subsea should:

  • Provide the insulation properties at the design water depth as required by the flow assurance analysis as described in the contract documents.
  • Not hinder system functionality.
  • Not susceptible to damage during installation.
  • Be included in the piping flexibility analysis.
  • Be compatible with the plan for corrosion protection.
  • Be of seamless construction (e.g. not have any gaps) or poured.
  • Be compliant with the equipment it is adhered to (e.g. not crack, open up gaps, etc.) during installation and operation over the design life.
  • Be applied after final assembly and FAT, but before system integrity test.

Related Posts


Subsea Controls Umbilical Distribution Configuration
Subsea Controls Umbilical Distribution Configuration

PURPOSEAs part of any Pre-FEED or FEED studies, the configuration of the subsea distribution equipment should be defined in the …

Application of Thermal Sprayed Aluminum to Subsea Structures
Application of Thermal Sprayed Aluminum to Subsea Structures

1.0 ScopeThis specification defines the minimum requirements for the surface preparation, application and inspection of thermal sprayed aluminum (TSA) coatings …

Subsea Umbilical, Controls Testing and Pre-Commissioning Requirements
Subsea Umbilical, Controls Testing and Pre-Commissioning Requirements

1. INTRODUCTION1.1 Project OverviewThis document provides the requirements for testing and commissioning of the umbilicals and subsea production controls system.1.2 …

Subsea Commissioning Philosophy
Subsea Commissioning Philosophy

This document is to detail pre-commissioning, commissioning, start-up and performance testing requirements for the subsea system.Drilling and Completion activities related …

Subsea DeCommissioning Philosophy
Subsea DeCommissioning Philosophy

This document is to detail the requirements for decommissioning of the subsea systems, flowlines and wells.Wells, subsea and flowline systems …

Subsea Sparing and Tooling Philosophy
Subsea Sparing and Tooling Philosophy

This document is to describe the sparing and tooling requirements for the manufacture, testing, installation, pre-commissioning, commissioning and operation of …