Does anyone have experience pulling standard twisted, shielded instrument cable and having construction perform field connections to Turck type connectors?
Buying standard cable vs. pre-fab cable from Turck is lower cost, but there is concern about a few things, one of which is the likely quality of the connection made in the field.
Thanks.