Should FPSO Contractor be invited along with Subcontractors to a pre-installation survey?

Asked by RichS29 6 years ago | 1 Answers

Should FPSO Contractor be invited along with Subcontractors to a pre-installation survey carried out at the field to confirm agreement for offshore activities to proceed?


1 Answer

0
gagonza 6 years ago
Yes, all Contractor and Subcontractors should be invited to the pre-installation survey carried out at the field for a visit typically 3-days to witness and confirm agreement for offshore activities.

Related Posts


Material Selection and Corrosion Control for Offshore Platform and FPSO
Material Selection and Corrosion Control for Offshore Platform and FPSO

Detailed corrosion prediction evaluations including consideration for CO2 should be performed to establish a materials selection and corrosion control report …

Next generation new built hulls for Floating Production Storage and Offloading (FPSO)
Next generation new built hulls for Floating Production Storage and Offloading (FPSO)

MODEC has announced that it has developed the “MODEC NOAH” and “M350”, next generation new built hulls for Floating Production …

FPSO Conversion Lessons Learned
FPSO Conversion Lessons Learned

FPSO conversions! Either VLCC to FPSO, FPSO redeployment, or similar engineering works for life extension of naval surface vessels, this …