What possible steps Marine Operations should consider to prepare for a new or convert FPSO?


1 Answer

1
pasmith 6 years, 2 months ago

Consider the followings:

  • Weight Control
  • Damage Control
  • Stability Control
  • Marine Control Procedures
  • Adverse Weather Procedures
  • Marine Operating Procedures
  • Shuttle Tanker Offloading Procedures
  • Terminal Regulations
  • Diving / ROV Operations
  • Ballast Operations
  • Vessel Transfers

Related Posts


Material Selection and Corrosion Control for Offshore Platform and FPSO
Material Selection and Corrosion Control for Offshore Platform and FPSO

Detailed corrosion prediction evaluations including consideration for CO2 should be performed to establish a materials selection and corrosion control report …

Next generation new built hulls for Floating Production Storage and Offloading (FPSO)
Next generation new built hulls for Floating Production Storage and Offloading (FPSO)

MODEC has announced that it has developed the “MODEC NOAH” and “M350”, next generation new built hulls for Floating Production …

FPSO Conversion Lessons Learned
FPSO Conversion Lessons Learned

FPSO conversions! Either VLCC to FPSO, FPSO redeployment, or similar engineering works for life extension of naval surface vessels, this …