Dear community

Our specification calls for line pipe API-5L X52QS PSL2 for sour service meeting ISO 15156/NACE MR0170. Due to small quantity for fabricating launchers/receivers, our fabricator proposes to utilize ex-stock line pipe of API-5L X52Q. In order to meet API-5L X52QS, they propose to conduct additional testings in accordance with Annex H and Annex K of API-5L.

Whilst it is technically feasible to ensure the material meet the intent with the additional tests, Standard API 5L, however, states following restriction in re-certification by another party other than the mill/manufacturer as follow :

11.4.2 The manufacturer is responsible for ensuring that the pipe conforms to the requirements of each of the certified grades. This allows pipe to be used as any of the grades individually.

11.4.4 After delivery of the pipe, no re-marking or re-certification of the pipe to a different grade or

different PSL level (PSL 1 to PSL 2) shall be permitted.

Also

3.1.43 pipe grade is defined as Designation of pipe strength level.  NOTE Chemical composition and/or heat treatment condition of a pipe grade may differ.

May I have your interpretation to the above restriction on

1) Whether X52Q and X52QS are treated as different grades though both grades carry same TS and YS ?

2) Whether another party other than the mill/manufacturer is allowed to perform additional tests to re-certify the material ?

Be the first one to answer!

Related Posts


Flowline - Pipeline Thermal Expansion Calculation
Flowline - Pipeline Thermal Expansion Calculation

SUMMARYFlowline/Pipeline Thermal/Pressure Expansion can be developed for submarine pipelines (both single pipe and Pipe-in-pipe) expansion assessments due to pressure and …

Piping and Vessels Preparation for Commissioning - Part 3
Piping and Vessels Preparation for Commissioning - Part 3

Part 2 - Leak Test 3. Dry-out3.1 GeneralAt the end of construction, and following commissioning tasks such as water flushing, …

Piping and Vessels Preparation for Commissioning - Part 5
Piping and Vessels Preparation for Commissioning - Part 5

Continue of Part 4 - Chemicals Loading of Vessels5. Inert gas purging 5.1 GeneralInert gas purging is most frequently required …

Pipeline Abandonment
Pipeline Abandonment

Requirements Pipelines should be decommissioned and abandoned (by removal or abandonment-in-place) in accordance with applicable national, regional and local regulations …

Oil production well simulation modeling problems and uncertainties
Oil production well simulation modeling problems and uncertainties

Oil and gas well modeling problems and uncertainties such as transient effects in the earth/formation for a single well, repeated …

Preventing scales in pipelines, wells, injection manifolds, etc.
Preventing scales in pipelines, wells, injection manifolds, etc.

Scale in pipelines, wells, injection manifolds greatly impacts the facility in a number of ways including deferred production, lost revenue …