FPSO Contractor is NOT responsible for what Environmental Management System effects?

Asked by RichS29 6 years ago | 1 Answers

What are the Environmental Management System (EMS) that not included in the FPSO Contractor's scope as risk assessment evaluation of acute and chronic environmental effects?


1 Answer

0
gagonza 6 years ago

FPSO Contractor EMS's scope typically does not currently include a risk assessment evaluation of acute and chronic environmental effects on:

  • Controlled and uncontrolled emissions of matter and energy to land, water and air
  • Generation and disposal of solid and other wastes
  • Use of land, water, fuels, energy and other natural resources
  • Noise, odour, dust and vibration
  • Effects on ecosystems
  • Effects on natural and conservation areas and archaeological sites

Related Posts


Material Selection and Corrosion Control for Offshore Platform and FPSO
Material Selection and Corrosion Control for Offshore Platform and FPSO

Detailed corrosion prediction evaluations including consideration for CO2 should be performed to establish a materials selection and corrosion control report …

Next generation new built hulls for Floating Production Storage and Offloading (FPSO)
Next generation new built hulls for Floating Production Storage and Offloading (FPSO)

MODEC has announced that it has developed the “MODEC NOAH” and “M350”, next generation new built hulls for Floating Production …

FPSO Conversion Lessons Learned
FPSO Conversion Lessons Learned

FPSO conversions! Either VLCC to FPSO, FPSO redeployment, or similar engineering works for life extension of naval surface vessels, this …