Availability and commitments of installation vessel for FPSO Topsides?

Asked by Dan01 5 years, 10 months ago | 1 Answers

If I am currently in the FEED Stage of an FPSO, is it feasible to ask the FPSO Contractor reserve/guarantee an installation vessel for the FPSO topsides?)


1 Answer

0
Normandy 5 years, 10 months ago
During the current environment & high demand for offshore installation works whether a FPSO/FSO ot Jack-ups/Submersibles, commitment of installation vessel cannot be provided since installation work is about 3 years down the road.

Related Posts


Material Selection and Corrosion Control for Offshore Platform and FPSO
Material Selection and Corrosion Control for Offshore Platform and FPSO

Detailed corrosion prediction evaluations including consideration for CO2 should be performed to establish a materials selection and corrosion control report …

Piping and Vessels Preparation for Commissioning - Part 1
Piping and Vessels Preparation for Commissioning - Part 1

1. IntroductionBefore undertaking introducing the feed into a facility, a number of specific process operations must be carried out on …

Piping and Vessels Preparation for Commissioning - Part 3
Piping and Vessels Preparation for Commissioning - Part 3

Part 2 - Leak Test 3. Dry-out3.1 GeneralAt the end of construction, and following commissioning tasks such as water flushing, …

Flushing and cleaning process lines and vessels during pre-commissioning
Flushing and cleaning process lines and vessels during pre-commissioning

This article discusses four different flushing and cleaning methods for process lines and vessels during pre-commissioning.Cleaning with airCleaning with steamCleaning …

Next generation new built hulls for Floating Production Storage and Offloading (FPSO)
Next generation new built hulls for Floating Production Storage and Offloading (FPSO)

MODEC has announced that it has developed the “MODEC NOAH” and “M350”, next generation new built hulls for Floating Production …

FPSO Conversion Lessons Learned
FPSO Conversion Lessons Learned

FPSO conversions! Either VLCC to FPSO, FPSO redeployment, or similar engineering works for life extension of naval surface vessels, this …