What is the typical design life for ballast tank filling hoses on fpso?
Pipe Flanges – Do’s and Don’ts
What is a slick joint in the completion string?
Air Supply and Distribution for Instrument Control Panel
How to size the diesel storage tank for use onshore/offshore facilities?
Start-Up is the responsibility of the Operations Group and the activities are defined in a dedicated project Start-up Manual. The Project Completions Group will have a team of personnel available t...
All subsea valves associated with or controlled by the subsea control system and/or IWOCS should: Be designed and manufactured to attain, as a minimum, a hydraulic cleanliness level ...