Blog
Knowledge Base
Questions
Jobs
Calculations
Search
Search
Sign in
|
Join now
Habib Ramini
Questions: 7 Answers: 5
Recent Activities
Ask A Question
Questions
Answers
maximum length of 1/2" instrument air tubing
What is the recommended average metal temperature for Refrigerated Storage Tanks?
What would the average performance (in Stands) be for a derrick structure in the North Sea
Is safety valves design pressure same as MAWP?
How to calculate flow coefficient (C) for PSV sizing for tube rupture senario
Rubber Hose vs. Composite Hose
Constructability Suggestions for Contracting Strategy for Subsea Equipment Vendor (SEV) and Subsea Installation Contractor (SIC)
Need to identify stabilization period for flexible and rigid jumper combination for hydrotest.Identify plan to dewater pipeline, specifically gas injection (define dryness criteria). Need to define...
Reduce height of riser jumper (RJ) by consider adding additional PLET at base of riser.Eliminate doglegs in horizontal portion of RJ.Need vertical clearance above RJ connector for running tools &am..;.
Keep manifolds within project pre-specified installation load (including dynamic load). Ensure risk of bid from contractors coming in with greater dead weight is minimized.Keep manifold foundation ...
Consider making UTA independent of water injection manifold.Address slack loop (over length compensation) consideration on as-built length of umbilical. Vee support concept on water injection manif...
Consider having riser supplier supply both halves of connector. Same applies to manifolds, trees. Attempt to standardize on connectors.Develop coordinated connector system strategy for field (consi...